Building Requirements

These requirements are for lot owners in Bighorn Hills Estates Subdivision (BHH) to implement the covenants required for building. It is the responsibility of the property owner to ensure all the following requirements are met prior to the commencing of any excavation on any lot in BHH.

1.   Complete and sign the building application below  and submit to the Architectural Control Committee (ACC) at Board@bhhe.org.  Submission of plans showing construction details, square footage, floor plans, elevation, siding and roof type and color. Electrical, plumbing and framing details are not needed. Computer versions of plans are preferred.

2.   Submission of a plot plan identifying placement of structure on lot including septic system, driveways, etc.  Description of trees removed and any changes to the lot. All building setbacks must include all permanent structures including eves, decks, etc.

3.   Receipt of a $8,000 water access fee. 

4.   Receipt of a $4,000 deposit, which may be refundable to ensure repair of any damage to the subdivision properties such as roadways, water lines etc. assure all building requirements are met and lawyer expenses and late fees paid. This is only a deposit; the member is responsible for all cost of repairs and fines. The deposits may not be refunded should any of the requirements on this page not be met per the ACC’s interpretation and until project completion. Includes obtaining a certificate of occupancy or final ACC inspection. It is the owner’s responsibility to close out their project with the ACC. This is to be done by submitting the County Certificate of Occupancy. Should this not occur within 90 days of suspected completion. All funds will be retained.

5.   The footprint location of the buildings and driveways are to be staked on the lot and approved by an Architectural Control Committee member or its designee. This is to ensure all required setbacks from property lines are met. A minimum of 72 hours’ request needs to be provided. The member is responsible to assure surveyed property lines are correct and a sting line must be strung on all adjoining property lines throughout construction.

6.   Provide sanitation facilities on site during construction starting with the excavation of the site.

7.   There will be a minimum of 72 hours’ request given to the Board prior to hooking up to the subdivision water system. A water committee member, or a knowledgeable Board member, or designee, will be on site during any water hookup. We recommend that water hookup contractors familiar with the BHH water system be utilized to accomplish the water hookup. A list is available from the BHH board. No water hook-ups allowed after October 1, nor before May 1.

8.   When building is complete, drainage from subdivision roadway to property must be maintained to facilitate water runoff. This can be accomplished either by a culvert or a drivable dip capable of handling drainage. If a culvert is required, the county will furnish the size required. 

9.   You will have 1 year from the time of footing excavation to complete construction. A 6-month extension may be granted by the ACC if requested in writing prior to the completion of the initial year. Should construction not begin within the year of approval, approval is rescinded and you must resubmit plans and work through the process again.

10.  Other association building requirements i.e. setbacks, etc. may be found in the Covenants, Conditions and Restrictions (CCRs) Article VI Architectural Control and VII Use Restrictions, and By-Law VI Section 2 Architectural Control Committee.

11. Pursuant to CCR Article 7.1. “No multiple story buildings shall be built unless specifically approved by the board with due consideration for the scenic views of other Lots in the Subdivision” The Board has defined that any structure above 18 feet above native ground levels is considered a multiple story building and must be specifically approved by the Board. The Boards standing policy is and has been to send plans of structures to the adjoining lot owners to assess their potential concerns with view and harmony with the surrounding area.

The ACC per By-law VI Section 2. And Section 8 have adopted these rules for its own government and have found them not to by inconsistent with these By-Laws and have been voted on and approved by the board on 12/17/2020 with revisions on 9/8/2025.

The CCRs, By-Laws, and Building application may be found on the associations blog at: bighornhillsestates.blogspot.com 

Bighorn Hills Estates

Board of Directors

Effective December 17, 2020

Send all building plans to:

Architectural Control Committee

 Board@bhhe.org


BIGHORN HILLS ESTATES SUBDIVISION
APPLICATION FOR ARCHITECTURAL CONTROL COMMITTEE APPROVAL
OF BUILDINGS AND STRUCTURES ERECTED, CHANGED, OR ALTERED WITHIN SUBDIVISION

This Application and all supporting plans, specifications and other documents must be submitted to the Architectural Control Committee of the Bighorn Estates Hills Subdivision by email to: board@bhhe.org or alternatively by mail to:  
390 Advantage Ln, Ammon, ID 83406

 Applicant:

Name(s)

 

Mailing Address

 

Phone No.

 

Email Address

 

 Lot Number or Address within Subdivision where Proposal is sought to take place:

Lot No. or Address

 

 Check any of the following to which this Application applies:

☐ Primary Home              ☐ Fence

☐ Guest house                 ☐ Wall

☐ Private Garage             ☐ Other ____________________________________________

 Provide a description of the building, structures, changes, or alterations sought to be approved:

 

  

 

 

 

 Comprehensive plans and specifications for the Proposal must be included with this Application. List all plans, specifications, and other supporting documents included with this Application:

 

 

  

 

 

 Identify the Start Date and End Date:

Start Date:

End Date:

 Provide the name and phone number for the contractor or party responsible for completing desired work:

Name

 

Phone No.

 

___________________________________________________________________________________

By my signature below, I submit this Application to the Architectural Control Committee of the Bighorn Hills Estates Subdivision and further certify and agree to the following:

1.     I understand that the applicable CCR’s for Bighorn Hills Estates Subdivision provides that “No building, fence, wall or other structure shall be commenced, erected or maintained upon any Lot, nor shall any exterior addition to or change or alteration therein be made upon any Lot until the plans and specifications showing the nature, kind, shape, height, materials and location of the same shall have been submitted to and approved in writing as to the harmony of exterior design and location in relation to surrounding structures and topography … by an architectural committee composed of three (3) or more representatives appointed by the Board.”

2.     I understand that the applicable CCR’s for Bighorn Hills Estates Subdivision provides that “No multiple story buildings shall be built unless specifically approved by the Board with due consideration for the scenic views of other Lots in the Subdivision.” I agree that a multiple story building is any building with a height over 18 feet or living space on multiple levels even if the living space is in an attic.

3.     No work with respect to the proposal set forth in this Application may be performed prior to receipt by Applicant of written approval thereof from the Architectural Control Committee. Should work not commence (footing excavation) within one year of ACC approval, approval is rescinded and a new application will be submitted.

4.     All information, plans, specifications, data, and supplemental materials submitted with and in respect to this Application are complete, true, and correct. No construction, changes, alterations, or work associated with the proposal set forth in this Application shall deviate in any way from the plans, specifications, and other documents submitted herewith and any terms and conditions contained within any approval of this Application, and any such deviations shall be timely corrected at Applicant’s expenses. Any alterations between what is approved by the ACC and what is constructed without prior approval will be subject to a Five Hundred ($500) Dollar per day charge until the non-conforming construction is corrected. Any construction, change, alteration, or work initiated but not completed by the indicated and approved End Date shall be subject to a daily fine of $50.00 per day until completed, unless an extension has been granted in writing by the ACC. The ACC may grant a six-month extension.  However, it is the members responsibility to request this prior to the construction deadline.

5.     Applicant shall be bound by the Amended Declaration of Covenants, Conditions and Restrictions for Bighorn Hills Estates Subdivision, and all rules adopted by the Bighorn Hills Estates Property Owners Association, Inc.  The applicant agrees to pay all legal fees and costs incurred by the Association to enforce any rule, regulation, covenant, restriction, or agreement concerning the subject of this Application.

6.     Applicant has no unpaid assessments, dues, fines, or penalties owed to the Bighorn Hills Estates Subdivision or the Bighorn Hills Estates Property Owners Association, Inc.

7.     Applicant shall be responsible for obtaining any permits or authorizations from the County or the State of Idaho as may be necessary for the proposal set forth in this Application. All work performed in furtherance of the proposal set forth in this Application shall conform with all building and fire codes as may be applicable thereto. No approval of this Application shall ever be construed as representing or implying that the associated plans and specifications will results in a properly designed structure or satisfy any legal requirements.

8.     Applicant is responsible for following the Bighorn Building requirements and must coordinate stake inspection and water hookup with the ACC.  72-hour request will be made.

9.     The Board of Directors or their designated official has the right and will be allowed to inspect the premise during various stages of construction to assure compliance with approved plans. 

10.  Applicant shall be responsible to request any road or building refundable fees.  The failure to request a refund of the remaining fee within 90 calendar days from the issuance of the Certificate of Occupancy will be deemed a forfeiture of any remaining refundable deposit. Decisions on whether applicant will receive any or all refundable deposits is at the discretion of the (ACC or HOA) board. And their decision will be binding on all parties.

Applicant Signatures:

Date: ____________________________

 ___________________________________                ______________________________________

Applicant/Owner                                                                             Applicant/Owner

___________________________________________________________________________________

PLEASE DO NOT WRITE BELOW THIS LINE

Date: _________________          ACC Member: ________________________________________ Vote: Approve / Deny

Date: _________________          ACC Member: _________________________________________ Vote: Approve / Deny

Date: _________________          ACC Member: _________________________________________ Vote: Approve / Deny

According to the majority vote shown above, this Application is hereby _______________________

Committee Comments/Conditions:

Water Fee Received on: ________________________________________

Road and Building Deposits Received on: ______________________________________

Call for Stake inspection on: ___________________        Performed on: _______________________

Issues noted: _______________________________________________________________________

Water Hook-up notifications on: _________________________________________________

Nome of Observer: ______________  Time of observations From: _____  To: _____ Total Hours ____

Issues noted: _______________________________________________________________________

Final Inspection or Certificate of Occupancy: ________________________________

Name of Observer: _________________________           Date: _________________